Questions and answers
Over the course of our consultation we have received a variety of questions from local groups and organisations. Below we have aimed to respond to the most frequently raised topics and themes.
What is proposed, and could the site be used for something else in future?
The proposals are for sports, leisure and supporting facilities. Any future change of use or alternative proposal would need the relevant planning applications to be submitted and decided by Harrow Council.
In summary, the plans include:
- 40 sheltered and 10 external driving range bays
- Golf training simulators and supporting golf facilities
- Three covered and two outdoor padel courts
- Exercise, fitness and wellbeing space
- An accessible gym and treatment rooms
- Café and clubhouse facilities
- Landscaped outdoor areas, walking routes and seating
- Visitor, staff and accessible parking
How does the design respond to the Green Belt and previous planning decisions?
Project Fairway aims to restore the site’s long-standing sports and leisure use with modern facilities that respect the open landscape and nearby woodland.
The design keeps buildings together in a compact area, in the established location of development, to limit their spread into the wider landscape. Following feedback from council officers and the design review, the size, shape and layout have been revised to make the buildings less prominent, protect important views, mature trees and woodland, and keep development close to previously developed parts of the site.
Previous planning decisions raised concerns about the size and bulk of buildings and their effect on the landscape. The proposals respond by grouping buildings together, adding planting to help screen them and using high-quality natural materials suited to the Green Belt setting.
The aim is to bring a vacant and deteriorating site back into use as a well-designed leisure destination that respects its Green Belt location and provides significant recreation, health and community benefits.
What would happen to the mounds of earth on the site?
The earth mounds were built to restrict potential anti-social or criminal activity while the site’s future was being considered. The planning application will include landscaping proposals for the mounds. The vast majority will be removed so the site can operate.
Why is the building the size proposed and why is it three storeys?
The proposals include driving-range bays, sports and specialist exercise facilities, a café, community and supporting spaces, and outdoor padel courts.
Part of the building would have three storeys. The top floor would include spaces for movement activities and community use, with terraces. The roof and outside walls have been designed to make the building appear smaller.
The building has been designed to minimise its effect on views. It has been assessed from more than a dozen locations, including residential streets and public rights of way, and the visual impacts are negligible.
Three storeys allow space for a range of facilities that we believe would help make the proposals successful.
Why include padel and wellbeing facilities alongside golf?
We want to offer a mix of sport, health and leisure facilities for people of different ages and backgrounds, with activities throughout the year.
Our research indicates that Harrow has a limited number of padel courts, concentrated in a few locations, and none in Stanmore. It also indicates significant demand, including from existing tennis clubs that cannot meet this demand.
What type of gym is proposed?
The latest design includes a specialist gym focused on movement and gentle exercise, including for people with limited mobility or additional needs. It would be supported by treatment and therapy rooms and a movement studio.
The equipment and arrangements for running the gym are still being developed.
Would the nine-hole golf course return, or could there be a practice hole or putting green
The proposals would reinstate the driving range, supported by golf simulators, but we are not proposing a nine-hole course. This takes account of existing practice facilities in the area, such as Stanmore Golf Club and Mill Hill Golf Club.
Additional practice facilities, such as a putting green and an area for practising short shots, could be considered.
What would there be for children and families?
The proposals include play space, features that children can play on, informal outdoor spaces and walking routes alongside the sports facilities. These would be open to the public.
We have received feedback asking for a dedicated play area and are considering opportunities to include this in the plans.
Could I visit the café without taking part in sport?
Yes. The café, terrace and public areas are intended to welcome people who are not taking part in sport, including those walking locally or watching someone play.
Who could use the facilities?
Project Fairway is intended to be open to everyone, with facilities for people of different ages and abilities. This includes golfers, padel players and people using the exercise and wellbeing facilities, café and landscaped spaces.
An operator has not yet been selected at this early stage. They would set out the booking and membership arrangements.
We are exploring a Community Use Agreement and have started speaking with local schools, community groups, health and care providers and accessibility groups. This work is ongoing, and we hope it will help shape community access to meet genuine needs.
How much would activities cost, and would local people get discounts?
A future operator would determine prices, reduced rates and any offers for local people. Community feedback has highlighted the importance of affordability, including for people who might otherwise find it difficult to take part.
We would seek to offer both membership and pay-and-play options, so people could pay each time they visit.
How would schools and community groups benefit?
A Community Use Agreement is being developed to set out how the community could access the facilities. Consultation will help shape these arrangements.
Groups that could be given priority include schools and charities supporting children with special educational needs and disabilities, disability sports organisations, older people’s charities, care providers and youth organisations.
The car park has been designed to allow minibuses to drop off passengers and park, helping these groups visit.
What is a Community Use Agreement?
A Community Use Agreement helps ensure local people can access new, expanded or replacement sports and leisure facilities, often outside their main operating hours.
For example, it could provide free hours for a community group, organisation or school that could not otherwise access activities such as padel or golf.
It is usually a legal agreement secured by condition of a planning permission.
What facilities are proposed for disabled people and older residents?
The proposals include a specialist gym with movement machines and equipment for gentle exercise, plus treatment rooms that might offer physiotherapy or similar treatments.
A separate entrance would be close to accessible parking spaces and a minibus drop-off point. These facilities are intended to support people with limited mobility and additional needs.
What would the opening hours be?
Opening hours have not yet been decided. They are likely to vary between facilities to reflect how each would operate. For example, the driving range could stay open later than the padel courts.
Could community groups use the rooms?
The latest design includes a community space and a movement studio that could support different activities. The consultation is helping us understand how these spaces could best be used.
Booking arrangements and charges have not yet been determined.
Would the site host weddings, banquets or private parties?
No wedding or banqueting venue is proposed. The café and clubhouse would support the sports and leisure facilities.
There would be flexible space for community use, but it would not be large enough for weddings or similar events.
Would alcohol be served or music played?
The design includes a clubhouse bar and spectator lounge, which we believe would complement the sports facilities. Any licences would need to be applied for separately, with limits set by the council.
We expect some music to be played indoors, but not concerts, gigs or loud music that could affect neighbours.
Would there be enough parking, and how would local roads be affected?
Access from Brockley Hill would be kept. Assessments of parking and vehicle movements are underway. The proposed number of parking spaces is based on similar facilities and expected demand. Following discussions with Harrow Council, an overflow car park is included for busy periods.
A detailed transport statement will be submitted with a future planning application for the council to review. The aim is to avoid harm to local road safety and prevent visitors parking on surrounding streets.
Would there be public walking routes or links to nearby parks?
We have reviewed the potential for a connection south to Cleopatra Close Park, linking with local walking routes. We will work with the council on a study to assess what is possible, with the aim of improving this existing connection.
How would potential noise be managed?
Noise is being assessed as part of the planning application. The initial assessment shows that the large distance between the courts and the nearest home means there would be little or no impact.
The detailed assessment will help determine how the facilities operate and any measures needed to protect neighbours. It will be submitted with the planning application and reviewed by the council’s planning department.
Would floodlighting affect nearby homes or wildlife?
Lighting would be needed for the sports facilities. We aim to reduce glare and light reaching surrounding areas by using modern lighting that can be carefully controlled and directed. The building design and layout also aim to limit this light spill.
We are working with our in-house specialists and the relevant organisations that must be consulted as part of the planning process to protect neighbours.
Using advances in lighting technology, we aim to achieve an overall reduction in light spill from the driving range.
How would nearby woodland and existing trees be protected?
The layout and landscaping aim to keep existing green features and provide enough separation from the ancient woodland. This includes a substantial planted area between the development and woodland, with no buildings in it.
The building design aims to limit light reaching the woodland. New planting and habitat features would support wildlife.
We do not expect any harmful effects on Pear Wood Nature Reserve or the adjoining ancient woodland.
How would rainwater be managed and wildlife supported?
The landscaping includes planting, meadow areas and drainage features such as surfaces that let rainwater soak through and a drainage pond. These are intended to prevent rainwater running off the site and avoid potential flooding.
The proposals aim to achieve a 10% biodiversity net gain, meaning an overall improvement in habitats for wildlife. We see this as a real benefit.
How many jobs would be created, and why has the estimate changed from 70?
The earlier estimate of 70 full-time equivalent jobs was a broad estimate that did not account for the specific nature of the site. We now expect around 20 to 30 full-time equivalent jobs.
This describes the total amount of work measured in full-time roles, rather than a confirmed number of individual employees.
It remains an estimate based on how we expect the facilities to operate. The operator would decide the final mix of full-time and part-time positions.
Would local people and people with additional needs benefit from jobs and training?
Our ambition is to promote jobs and training opportunities locally. Recruitment, training and support to help people into work have not yet been agreed in detail.
These arrangements would likely be covered by planning conditions or an advisory note as part of a future application.
What shows the project would be financially sustainable in the long term?
The mix of golf, padel, exercise and wellbeing facilities is intended to attract a wider range of people throughout the year and help the project remain financially sustainable.
The landowner is committed to providing recreation facilities for a wide range of groups in an area where provision is limited. We believe the proposals would meet this need.
When would building work start, how long would it take and would roads close?
The construction timetable has not yet been confirmed and depends on planning permission.
The timing, access for construction vehicles and any effects on local roads will be decided later. If planning permission is granted, it would likely require a Construction Traffic Management Plan setting out how construction traffic would be managed.
When would the detailed reports and studies be available?
When a planning application is submitted, all detailed reports will be available on Harrow Council’s website.
